Elite Screens ARE120HW3-E20

Elite Screens Aerie Tension ARE120HW3-E20 120 169 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theatre ProAV and Custom Installation.

Key Specifications
  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160 wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled ready to install
  • Aluminium housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Internal Radio Frequency/Infrared receivers with IR RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • (ARE120HW3-E20)

    SKU ARE120HW3-E20
    Brand Elite Screens

    Be The First To Review This Product!

    Help other Technologies 2000 (Aust) Pty Ltd users shop smarter by writing reviews for products you have purchased.

    Write a product review